Like I said, it was never going to be tomorrow, and tampering expectations with some understandings of the complexities that are happening in this plan should tell you that even if everything falls in perfect sequence, a lot of these steps have to come to fruition completely, for the next step after it to start. I feel like this is a 5 year minimum plan, with a sweet spot in the 6 to 8 year range. There are a lot of studies, remediations, investigations, and flat out construction that needs to happen before the Sox can even break ground on a new stadium. Keep that in mind. Again, first thing is all of the red tape needs to be cleared up to get the new Amtrak site even started. Once it is started, then you have the construction time needed before it becomes useable to Amtrak. That probably covers 2027-28. Once they move in, THEN the same process starts on the new site. All of the tear down, removal, remediation, and clean up will need to be done, before a stadium can break ground. Say 29-30 for the permitting, investigation, tear down, remediation, and removals. That brings us to 2030-2032 for construction, and a 2033 open. It might be conservative, but because these steps will not mostly overlap, and need to be done in sequential pieces, it can't be rushed as it would be in an open and clean site with no contingencies. This isn't tearing down a couple of bars and building like New Comiskey was.